Environment and heritage
Environmental consulting: independent reporting for environmental consultants and permitting leads
Reporting for environmental consultants on wetlands jurisdiction, Section 106 timing, remediation liability and data center siting.

Environmental consulting, defined
Environmental consultants assess how a project affects land, water, air and protected resources, and prepare the studies and permit applications that regulators require.
What Field Letter Press covers for environmental consultants and permitting leads
Field Letter Press follows the rules consultants apply and how they are moving: the federal test for regulated wetlands, clocks on heritage review, and the paperwork that now defines remediation risk.
Case in point
One Phase I standard now, and the 180-day clock that voids stale reports
Since February 2024 only ASTM E1527-21 satisfies the federal All Appropriate Inquiries rule for commercial property.
A buyer of commercial property protects itself from Superfund liability by conducting All Appropriate Inquiries before acquisition, and in practice that means a Phase I environmental site assessment. EPA recognized ASTM E1527-21 as satisfying the AAI rule in a final rule published December 15, 2022 and effective February 13, 2023. After a one-year overlap, the older E1527-13 standard stopped qualifying on February 13, 2024.
EPA had first proposed letting both versions stand indefinitely. It withdrew that direct final rule in May 2022 after adverse comments argued that two acceptable standards would confuse users, and the final version sunset the older one. EPA also said the ASTM standard is not itself a regulation and is not the only way to satisfy AAI. Forestland and rural property have their own standard, E2247.
The revised standard tightened rules that consultants deal with every week, including the shelf life of a report. Key components, such as interviews, lien and records searches and the site visit, must be completed or updated within 180 days before acquisition, and the standard clarifies how that viability date is calculated. A Phase I delivered early in a long deal can expire before closing.
Sources
- Beveridge & Diamond: EPA amends All Appropriate Inquiries standard
- Holland & Knight: EPA recognizes ASTM E1527-21
- Womble Bond Dickinson: EPA final rule on new ASTM Phase I standard
Checked against the sources listed, November 14, 2026. Figures and rules that change over time are re-checked when this page is updated.
Reporting on environmental consulting
- ExplainerWetland Delineation After the Rules Changed
The method for finding a wetland boundary has not changed. The federal test for whether that wetland is regulated has changed twice since 2023, and a third change is proposed.
- News analysisSection 106 in an Age of Fast Permitting
The Advisory Council on Historic Preservation voted in July to advance a rewrite of its Section 106 rules. Until a final rule is published, the existing regulation governs, and one court has already enjoined an approval that skipped a required finding.
- AnalysisRemediation’s Next Decade Is About Paperwork and Liability
A federal appeals court has left EPA's hazardous-substance designation for two PFAS chemicals in place. The exposure for owners and lenders runs through reports, certificates and recorded controls.
- News analysisData Centers and the New Geography of Land
ERCOT is tracking about 474 GW of large loads seeking a grid connection, most of it data centers. Texas and Virginia now require deposits and long contracts before a site's power is real.
Questions about environmental consulting
What is NEPA?
The National Environmental Policy Act requires federal agencies to assess the environmental effects of major actions before deciding on them, through a categorical exclusion, an environmental assessment or an environmental impact statement.
What is a Phase I environmental site assessment?
A Phase I assessment reviews records, inspects the site and interviews people who know it, to identify possible contamination before a property changes hands. It does not include sampling.
What has Field Letter Press published on environmental consulting?
Recent pieces include “Wetland Delineation After the Rules Changed”, “Section 106 in an Age of Fast Permitting” and “Remediation’s Next Decade Is About Paperwork and Liability”.
Related fields
Page updated November 14, 2026.