Specialty and trade contracting: independent reporting for subcontractors and trade contractors
Reporting for specialty contractors on default risk, surety underwriting, delegated design and the field labor that sets the schedule.

Specialty and trade contracting, defined
Specialty contractors perform particular scopes of work, such as electrical, mechanical, steel, concrete or glazing, usually under subcontract to a general contractor.
What Field Letter Press covers for subcontractors and trade contractors
Field Letter Press reports on where risk is pushed down the contract chain: default insurance bought above the subcontractor, what a surety reads in a backlog, and engineering delegated to the trades.
Case in point
New York capped private retainage at 5 percent, and you cannot contract around it
A 2023 amendment to the Prompt Payment Act changed the cash cycle for every trade on private work in the state.
Before November 17, 2023, an owner on a private New York project could withhold a reasonable amount as retainage, which in practice usually meant 10 percent. That day Governor Hochul signed S.3539/A.4167, amending the state's Prompt Payment Act. On private construction contracts of $150,000 or more entered into after that date, retainage cannot exceed 5 percent of the contract sum.
Three details matter to subcontractors. The cap flows down: a contractor cannot hold more from a subcontractor than the owner holds from the contractor. The parties can agree to less than 5 percent but not more. And a contractor may now submit its final invoice, including retainage, at substantial completion rather than final completion. Retainage still has to be released within 30 days of final approval of the work, and late release carries interest of 1 percent per month.
One common misreading is worth correcting. The cap applies to the total contract sum, not to each pay application, so an owner can still hold more than 5 percent of an early requisition as long as the aggregate stays under the limit. Construction loan agreements that require their own retainage may also need amending to fit.
Sources
- Duane Morris: New York's 5 percent retainage bill signed into law
- Thompson Hine: New York passes law to reduce retainage
- Kaufman Dolowich: total contract sum, not individual payments
Checked against the sources listed, November 14, 2026. Figures and rules that change over time are re-checked when this page is updated.
Reporting on specialty and trade contracting
- AnalysisThe Subcontractor Default Risk, and Who Carries It
A general contractor can cover a subcontractor's failure with a bond, an insurance policy or its own balance sheet. Only the bond protects the suppliers and lower-tier firms beneath the one that failed.
- ExplainerWhat Sureties Read in a Backlog
Surety underwriters compare a contractor's backlog with a version of working capital that leaves out the assets they do not trust. Backlog that grows faster than the balance sheet draws a closer look.
- ExplainerDelegated Design and the Missing Signature
Delegation moves design work to a specialty engineer. It does not move responsibility for the whole structure, and the written criteria are the only thing connecting the two.
- AnalysisSuperintendents Are Hard to Hire. The Schedule Effect Is Unmeasured.
Three in four contractors hiring superintendents say the job is hard to fill. No survey read for this article measures what that does to bidding or to schedules.
- AnalysisPrefab’s Hard Parts Include the Loading Dock
Federal rules cap vehicle width at 102 inches and leave wider loads to state permits. Shipping, the haul route and fit-up at the site decide whether factory savings survive delivery.
Questions about specialty and trade contracting
What is subcontractor default insurance?
Subcontractor default insurance is a policy bought by a general contractor that reimburses it for losses when a subcontractor fails to perform. It is an alternative to requiring a bond from each subcontractor.
What is retainage?
Retainage is a share of each progress payment, commonly 5 to 10 percent, that is held back until the work is complete.
What has Field Letter Press published on specialty and trade contracting?
Recent pieces include “The Subcontractor Default Risk, and Who Carries It”, “What Sureties Read in a Backlog” and “Delegated Design and the Missing Signature”.