The business of the built worldFree · Tuesday & Friday
Field Letter Press

Independent reporting on the built world

Risk, law and finance

Construction law and claims: independent reporting for construction lawyers and claims consultants

Reporting for construction lawyers and claims consultants on delegated design liability, default risk, handover and megaproject terms.

2 min read · Checked against sources November 14, 2026

Two people signing documents at a wooden table
Photo: Pexels. Stock photograph used for illustration.

Construction law and claims, defined

Construction law deals with the contracts, statutes and disputes that govern building: who owes what to whom, and what happens when the work is late, defective or unpaid.

What Field Letter Press covers for construction lawyers and claims consultants

Field Letter Press reports on where responsibility is written down and where it is not: the signature missing from delegated design, the paper trail that decides remediation liability, and the terms being renegotiated on megaprojects.

Case in point

A burst sewer in Brooklyn still decides who pays for bad drawings

United States v. Spearin turned 107 this year. Its rule depends on whether a spec is a design or a goal.

In 1905 George Spearin agreed to build a dry dock at the Brooklyn Navy Yard for $757,800, following plans and specifications prepared by the government. The site was crossed by a 6-foot brick sewer, and the government's plans told him where and how to relocate it. About a year later, heavy rain and a high tide built pressure in the relocated sewer, which broke and flooded the excavation. A dam in a connecting sewer, not shown on the plans, was part of the cause.

The Supreme Court decided the case on December 9, 1918. It held that specifying the sewer's character, dimensions and location carried an implied warranty that the sewer would be adequate if built as specified, and that general clauses requiring the contractor to examine the site and check the plans did not override that warranty. Spearin was entitled to stop work when the government refused responsibility.

The doctrine's reach turns on a distinction lawyers still argue about. It protects contractors who follow design specifications that tell them how to build. It generally does not extend to performance specifications that state an objective and leave the method to the contractor. As more risk moves into design-build and delegated design, more work falls on the performance side of that line.

Sources

  1. United States v. Spearin, 248 U.S. 132 (1918), Cornell LII
  2. U.S. Reports, 248 U.S. 132 (GovInfo)
  3. Zweig Group: Is there a doctrine in the house? (Part 2)

Checked against the sources listed, November 14, 2026. Figures and rules that change over time are re-checked when this page is updated.

Reporting on construction law and claims

Questions about construction law and claims

What is a change order?

A change order is a written amendment to a construction contract, agreed by the parties, that changes the scope of work, the price or the time for completion.

What is a mechanic's lien?

A mechanic's lien is a claim against a property by someone who furnished labor or materials to improve it and has not been paid. The rules and deadlines are set by state law.

What has Field Letter Press published on construction law and claims?

Recent pieces include “Delegated Design and the Missing Signature”, “The Subcontractor Default Risk, and Who Carries It” and “Remediation’s Next Decade Is About Paperwork and Liability”.

Related fields

Page updated November 14, 2026.