# Water and wastewater utilities: independent reporting for water utility managers and engineers

Reporting for water utilities on software procurement rules, federal security deadlines, asset condition and maintenance data.

## Water and wastewater utilities, defined

Water and wastewater utilities treat and deliver drinking water and collect and treat sewage. Most are public agencies that buy equipment and services under public procurement law.

## What Field Letter Press covers for water utility managers and engineers

Field Letter Press covers the gap between what utilities are required to do and how they are allowed to buy: security deadlines set by federal law, and procurement rules written for pipes and pumps applied to software.

## Case in point: Every lead pipe in ten years, and the agency that might have softened it chose to defend it

*The 2024 Lead and Copper Rule Improvements survived a change of administration. The deadlines now drive capital plans.*

EPA finalized the Lead and Copper Rule Improvements in October 2024. The rule requires most community water systems to replace every lead service line, and every galvanized line that is or was downstream of lead, within ten years, regardless of tap sampling results. It also lowers the lead action level to 10 micrograms per liter, eliminates the old trigger level, and generally prohibits partial replacements. Systems get a three-year preparation period before the ten-year clock starts.

The dates that matter for planning are fixed in the rule. Service line replacement plans are due to the state by November 1, 2027, and full replacement is due by November 1, 2037, with limited extensions for systems that would otherwise have to replace more than 39 lines per 1,000 connections each year.

Water utilities and their trade group challenged the rule in court. In a February 20, 2026 filing, EPA told the appeals court it would defend the ten-year mandate, including the position that utilities can be required to replace the portion of a line on private property. For engineers and contractors, that removes most of the uncertainty about whether the program is real. The inventory, plan and procurement work for 2027 is already due.

Sources:

- [EPA: Final LCRI technical fact sheet for states and public water systems](https://www.epa.gov/system/files/documents/2024-10/final_lcri_fact-sheet_statespws.pdf)
- [Florida DEP: LCRI schedule requirements](https://floridadep.gov/water/source-drinking-water/content/lead-and-copper-rule-improvements)
- [Water Online: EPA defends 10-year lead pipe replacement mandate](https://www.wateronline.com/doc/epa-defends-year-lead-pipe-replacement-mandate-affirms-utility-authority-and-feasibility-to-replace-all-lead-pipes-0001)

Checked against the sources listed, November 14, 2026.

## Reporting on water and wastewater utilities

- Explainer: How Water Utilities Are Allowed to Buy Software. Federal security deadlines put new duties on water systems this year. The procurement rules those systems must follow when they buy software were drafted for construction bids and engineering selection.
- Analysis: Bridges Age in Cohorts. Budgets Don’t.. The largest group of bridges in the federal inventory was built in the 1960s and is now mostly rated fair. The dedicated federal bridge formula money lapsed on 30 September.
- Analysis: Deferred Maintenance Has a Data Problem. The federal deferred maintenance backlog more than doubled on paper between fiscal 2017 and 2024. Auditors have shown that part of the growth came from changes in how agencies count.
- Explainer: The Digital Twin Nobody Is Assigned to Update. A record model can match the building at handover and drift with every work order after it. The one program reviewed here that keeps its data current ties the update to the maintenance work order.

## Questions about water and wastewater utilities

### What is a risk and resilience assessment?

Under America's Water Infrastructure Act of 2018, community water systems serving more than 3,300 people must assess risks to their systems, certify the assessment to EPA and review it every five years.

### What is SCADA?

SCADA stands for supervisory control and data acquisition. It is the system a utility uses to monitor and control pumps, valves and treatment processes.

### What has Field Letter Press published on water and wastewater utilities?

Recent pieces include “How Water Utilities Are Allowed to Buy Software”, “Bridges Age in Cohorts. Budgets Don’t.” and “Deferred Maintenance Has a Data Problem”.

Page updated November 14, 2026.