# Construction surety: independent reporting for surety underwriters, bond agents and bonded contractors

Independent reporting on construction surety: what underwriters read in a backlog, bonds versus default insurance, and contractor credit.

## Construction surety, defined

A construction surety guarantees to a project owner that a contractor will perform its contract and pay its subcontractors and suppliers. If the contractor defaults, the surety must make good on that guarantee.

## What Field Letter Press covers for surety underwriters, bond agents and bonded contractors

Field Letter Press reports on how sureties judge contractors and how that judgment moves through a project: the backlog an underwriter reads, the choice between bonding subcontractors and insuring against their default, and the figures a lender tests alongside.

## Case in point: The SBA bond guarantee now reaches $14 million on federal work

*The 2024 inflation adjustment was the first increase in a decade, and the program wrote $9.2 billion in contract value the next year.*

The Small Business Administration has guaranteed surety bonds since 1971. The program exists because a federal construction contract over $150,000 requires performance and payment bonds, and small or young contractors often lack the financial history a surety wants to see. SBA shares the loss with the surety, which lets the surety write bonds it would otherwise decline.

On March 18, 2024, SBA raised the program's contract limits for inflation, the first increase since 2013. The guarantee now covers contracts up to $9 million, or up to $14 million on federal contracts when a federal contracting officer certifies that the guarantee is necessary. The previous limits were $6.5 million and $10 million. Before 2013 the cap had been $2 million, apart from a temporary increase to $5 million in 2009 and 2010.

Scale gives the numbers context. In fiscal 2024, SBA guaranteed 11,092 bid and final bonds covering $9.21 billion in contract value. The contractor pays the surety's premium plus an SBA fee of 0.6 percent of the contract amount. For a surety producer, the higher limits mean a contractor can stay in the program for a larger job instead of being pushed into the standard market before its balance sheet is ready.

Audio: read-back of this piece at /audio/for/construction-surety.mp3

**Graphic: How far the SBA bond guarantee reaches.** Largest contract the guarantee covers, millions of dollars.
- 2013 to March 2024: Non-federal contracts $6.5M; Federal contracts, with contracting officer certification $10M
- Since March 18, 2024: Non-federal contracts $9M; Federal contracts, with contracting officer certification $14M
Source: U.S. Small Business Administration; Federal Register, Feb. 15, 2024.

Sources:

- [SBA: Surety bonds](https://www.sba.gov/surety-bonds)
- [Federal Register, February 15, 2024: SBA final rule](https://www.govinfo.gov/content/pkg/FR-2024-02-15/html/2024-02776.htm)
- [Congressional Research Service R42037: SBA Surety Bond Guarantee Program](https://www.everycrsreport.com/reports/R42037.html)

Checked against the sources listed, November 14, 2026.

## Reporting on construction surety

- Explainer: What Sureties Read in a Backlog. Surety underwriters compare a contractor's backlog with a version of working capital that leaves out the assets they do not trust. Backlog that grows faster than the balance sheet draws a closer look.
- Analysis: The Subcontractor Default Risk, and Who Carries It. A general contractor can cover a subcontractor's failure with a bond, an insurance policy or its own balance sheet. Only the bond protects the suppliers and lower-tier firms beneath the one that failed.
- Explainer: Reading a Bid Tab Like an Economist. Federal rules require a tabulation of every bid on federal-aid highway work. The number of bidders and the spread between them say more about the market than the low number does.
- Explainer: What Lenders Read in a Construction Schedule. Banks reported tighter standards for construction loans in the third quarter of 2026. The schedule of values and the project schedule are what a lender uses to judge whether a loan still has enough money and time in it.

## Questions about construction surety

### What is the difference between a performance bond and a payment bond?

A performance bond guarantees that the contract will be completed as written. A payment bond guarantees that subcontractors and suppliers on the project will be paid.

### Is a surety bond insurance?

No. A bond is a three-party guarantee among the contractor, the owner and the surety. The surety underwrites expecting no loss, and the contractor must repay the surety for any claim it pays.

### What has Field Letter Press published on construction surety?

Recent pieces include “What Sureties Read in a Backlog”, “The Subcontractor Default Risk, and Who Carries It” and “Reading a Bid Tab Like an Economist”.

Page updated November 14, 2026.